Finally, today we got power hooked up, which means they can finally sand and stain the floors, put the appliances in, do final paint touch up and all the little things that need to be finished. We're not done yet, but the end is in sight! It's possible we'll be in by March... maybe.
First, Google Maps is kind of cool in showing the construction sight from above. I should have bought a drone...
I got a kick out of watching the bulldozer move dirt around.
The shutters are laid out to dry, where the pool eventually will go.
The driveway takes shape...
View from the back '40.
More dirt. We got a lot of dirt.
The pool gets staked out!
More pool.
Wyatt gets an early start in the pool.
The drive way takes shape -- cobblestone curbs are in.
I actually got a kick out of how they built the pool. They put the rebar in and then just do the concrete by hand -- no "containing" walls which was amazing to watch.
The hot tub!
Concrete completed for the pool.
"I'm here to deliver some boulders."
Some of the backyard stonework going in.
View from the pool/hot tub.
The pool patio takes shape...
More progress on the steps and boulder wall.
Random kitchen shot.
Patio areas take shape.
View from driveway, though breezeway, to the pool.
The boulder wall takes shapee.
Looking down at the pool from the top step.
No comments:
Post a Comment