Finally, with permits approved, we were able to start work on the garage. Here they're laying the foundation for the garage:
View of the back of the house:
Wyatt chillaxin' on the gravel pile. If he's not careful, he'll end up part of the chimney.
The main staircase...
Another shot of the garage...
Some progress affixing the stone to the house.
More garage...
Nice view of the front of the house with the stone progressing.
We're putting in a geothermal heating and cooling system, which uses the constant temperature of water below the surface of the earth to both heat and cool the house. It requires very little energy and should cut the cost of heating and cooling the house by roughly 50% compared to traditional electric or natural gas systems. Anyway, here's the well digger.
View from the front...
Garage to the left.